Quick Reference
Menu map, demo-data codes and statuses
Menu Map
| Group | Models |
|---|---|
| Facilities & Design | Tailings Facility, Facility Component, Design Basis, Design Parameter, Construction Stage, Construction Quality Record, Nonconformance |
| Inspections & Defects | Inspection Template, Inspection Question, Inspection Schedule, Inspection Event, Inspection Response, Defect |
| Instrumentation & Monitoring | Instrument, Instrument Calibration, Monitoring Reading, Monitoring Current, Threshold Set, Threshold Rule |
| Events & TARP Response | Facility Event, TARP Plan, TARP Action Definition, TARP Activation, TARP Action Execution |
| Deposition & Environment | Deposition Record, Water Balance Period, Environmental Sample, Sample Result |
| Corrective Work | Corrective Action, Work Order |
| Assurance & Compliance | Review Record, Review Finding, Emergency Plan, Emergency Exercise, Requirement, Requirement Applicability, Controlled Document, Publication, Publication Authority |
| Rehabilitation & Closure | Closure Plan, Closure Criterion, Closure Monitoring Result |
| KPIs | Kpi, Kpi Result |
| Reference & Administration | Organisation, Mine Site, Person, Position, Person Position, Attachment |
Key Codes in the Demo Data
| Code | What it is |
|---|---|
DEMO_MINE |
Demonstration Mine (AU-QLD), operated by DEMO_MINING |
TSF-01 |
North Tailings Storage Facility — conventional paddock, ACTIVE, HIGH consequence, MOL 248.5 mRL, min freeboard 1.5 m |
EMB-N / DEC-01 / SPW-01 |
Northern embankment, primary decant, emergency spillway (components) |
DEMO_EOR |
Boulder Ridge Geotechnics — Engineer of Record (design basis v2.1, APPROVED) |
PZ-N-01 |
North embankment vibrating-wire piezometer (telemetry) — the TARP trigger source |
PZ-N-01-TRIG |
Threshold set: Level-1 > 130 kPa, Level-2 > 150, Level-3 > 170 |
TSF-EVT-2026-00042 |
62 mm rainfall event, 12 Jul 2026 — raised pond level and pore pressures |
TSF-TARP-2026-00011 |
LEVEL_1 activation — PZ-N-01 hit 138.5 kPa; deactivated after 48 h downtrend |
TSF-INSP-2026-00713 |
Daily inspection result DEFECT — new crest crack on EMB-N |
TSF-DEF-2026-00019 |
Defect: ~15 m crest crack — CLOSED after verified repair |
TSF-WO-2026-00088 |
Work order: crest crack sealing (Acme Civil), COMPLETE, $18.5k |
TSF-NCR-2025-0007 |
Stage-3 compaction nonconformance — reworked and CLOSED |
TSF-ENV-2026-0056 |
Downgradient bore MB-04 — groundwater sulfate 640 mg/L exceeds the 500 guideline |
TSF-REV-2026-0003 |
Annual Dam Safety Review 2026 — findings F-01 (monitoring), F-02 (survey) |
KPI-INSTR-DATA |
Instrument data availability KPI — currently WARNING (98.6% vs 99% target) |
Status Vocabularies (the important ones)
Facility status: PROPOSED → DESIGN → CONSTRUCTION → COMMISSIONING → ACTIVE
→ CARE_AND_MAINTENANCE → CLOSURE → POST_CLOSURE → DECOMMISSIONED
TARP level: NORMAL → LEVEL_1 → LEVEL_2 → LEVEL_3 → EMERGENCY — escalation
is graded; de-escalation is a recorded, approved decision
Reading status: VALID · ESTIMATED · SUSPECT · REJECTED · MISSING ·
SUPERSEDED — only VALID/ESTIMATED should update Monitoring Current
Action status (Defect, Corrective Action, Nonconformance, Review Finding,
TARP execution): OPEN → ASSIGNED → IN_PROGRESS → BLOCKED → COMPLETE → VERIFIED
→ CLOSED, plus CANCELLED, OVERDUE
Work order status: REQUESTED → APPROVED → PLANNED → RELEASED → IN_PROGRESS
→ COMPLETE → VERIFIED → CLOSED, plus CANCELLED
Severity (events, defects, findings, component criticality): INFORMATION ·
LOW · MODERATE · HIGH · CRITICAL · CATASTROPHIC
Inspection result: SATISFACTORY · OBSERVATION · DEFECT · SIGNIFICANT_DEFECT
· UNSAFE · INCOMPLETE
Document status: DRAFT · REVIEW · APPROVED · ACTIVE · SUPERSEDED ·
WITHDRAWN · ARCHIVED Closure status: NOT_STARTED · PLANNED · IN_PROGRESS
· MONITORING · CRITERIA_PARTLY_MET · CRITERIA_MET · ACCEPTED
Rules of Thumb
- An ACTIVE facility should have an accountable position, one APPROVED design basis, and an ACTIVE TARP plan and emergency plan.
- Only one threshold set per code should be ACTIVE for a facility at an effective date; a breach opens a TARP activation against the specific rule and the reading/event that triggered it.
- A TARP activation is not auto-deactivated by a later normal reading, and LEVEL_3 / EMERGENCY de-escalation needs authorised technical approval.
- A CRITICAL or CATASTROPHIC defect needs an immediate operational restriction or a documented emergency decision.
- A COMPLETE work order does not close its corrective action or defect — closure requires recorded verification.
- Overdue inspections, calibrations, reviews and actions stay visible on the operational dashboard.
- Water-balance variance beyond tolerance needs investigation and approval before the period is approved.
- A closure criterion reaches CRITERIA_MET only with a current monitoring result and evidence.